With regard to (41), this is partly attributable to some slips of the rock which were apparently solidly bedded in the ground where the road was in cutting and partly to the late payment last year of a sum for the construction of a portion of "the road adjoining Tai Po Road near Tai Wo Estate", which was to be carried out by contract. As the portion of road referred to was not completed, the money could not be paid out accordingly at the end of the year.

With regard to item (8), it was originally contemplated to construct a new shed upon the vacant land adjoining the Marine Depot, but was afterwards decided to provide the additional accommodation required by putting an upper storey on the existing sheds in the Ship and Swine Dépôt. This, though somewhat expensive in first cost, is more convenient in every respect for the future administration of the depôts and leaves the originally intended site vacant for extensions of the Battle Depot which are already necessary.

Provision (y) is to cover the excess of the contract obtained for the work above the estimated cost.

Edit History

2026-06-01 10:24:32 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
With regard to (41), this is partly attributable to some slips of the rock which were apparently solidly bedded in the ground where the road was in cutting and partly to the late payment last year of a sum for the construction of a portion of "the road adjoining Tai Po Road near Tai Wo Estate", which was to be carried out by contract. As the portion of road referred to was not completed, the money could not be paid out accordingly at the end of the year. With regard to item (8), it was originally contemplated to construct a new shed upon the vacant land adjoining the Marine Depot, but was afterwards decided to provide the additional accommodation required by putting an upper storey on the existing sheds in the Ship and Swine Dépôt. This, though somewhat expensive in first cost, is more convenient in every respect for the future administration of the depôts and leaves the originally intended site vacant for extensions of the Battle Depot which are already necessary. Provision (y) is to cover the excess of the contract obtained for the work above the estimated cost.
Baseline (Original)
With regard to (41), this is partly attributable to some slips of me rock which were 616 f apparceltly solidly bedded in the ground where the road was in cutting and partly to the payment last. it last year of a wow - for the construction of a portica of "the road adjoining perteparty craved. Mors itung Wa Whitice, which was to carried out coats be carried out by line. As the port ca of road referred to svaber completed, the money could not be paid weed accordingly hapad at the end of the year. लै With regard to item (8), it was originally contemplated to construct a new shed ups adjoining on the racont loud. the battle Depot, but was aftercoatits decided to provide the additional accommodation required. by putting upper storey woke E au a f the existing shad's in the shup and Swine Dépôt. This, though somewhat cxpensive in first cost, is wore convenient in every respect for the future admicen stration of the depôts and heaves the originally intended site vacant for extensions of the & atthe Depot which are already to be province (y) is to cover necessary. the of the contract obtained for the work above the estimated cost! Ihren
2026-06-01 10:24:32 · Baseline
View content

With regard to (41), this is partly attributable to some slips of me rock which were

616

f

apparceltly solidly bedded in the ground where the road was in cutting and partly to the

payment last.

it last year of a

wow -

for the construction of a portica of "the road adjoining perteparty craved.

Mors itung Wa Whitice, which was to carried out coats

be carried out by line. As the port ca

of road referred to svaber completed, the money could not be paid weed accordingly hapad at the end of the year.

लै

With regard to item (8), it was originally contemplated to construct a new shed ups

adjoining

on the racont loud. the battle Depot, but was aftercoatits decided to provide the additional accommodation required. by putting upper storey

woke E

au a

f

the existing shad's in the shup and

Swine Dépôt. This, though somewhat

cxpensive in first cost, is wore convenient in every respect for the future admicen stration of the

depôts and heaves the originally intended site vacant for extensions of the & atthe Depot which are already

to be

province (y) is to cover

necessary.

the

of the

contract obtained for the work above

the estimated cost!